What should buyers verify before the first witnessed test?
Start with the agreed drawings, cabinet schedule, acceptance criteria, instruments and named approvers. On site, verify the installed layout, ventilation, labels and service clearances. Ask the qualified site team to sign off the support and electrical interfaces in its scope. Record discrepancies before approval, with the affected cabinet position and the responsible party.

Carry forward the drawings and factory results, then verify conditions that depend on the finished site. Use the LED display installation site checklist for access and interfaces to assign structural connections, service paths, ventilation, cable support and site electrical verification to the responsible local teams.
How do you verify the actual canvas and content mapping?
Calculate the canvas from the ordered cabinet’s native grid and the installed column and row counts. Compare it with the as-built processor map. Display a labeled grid, check orientation and boundaries, then play the buyer’s real content through the intended sources. Agree how each source should scale, crop or fill the canvas.
| Model | Pixel pitch (mm) | Cabinet W × H × D (mm) | Pixels per cabinet (W × H) | Face (m) | Native canvas (pixels) |
|---|---|---|---|---|---|
| HK Series P1.25 | 1.25 | 640 × 480 × 48 | 512 × 384 | 2.56 × 1.44 | 2,048 × 1,152 |
| HK Series P2.5 | 2.5 | 640 × 480 × 48 | 256 × 192 | 2.56 × 1.44 | 1,024 × 576 |
Both example faces are 16:9 and have different native pixel counts. Confirm the ordered matrix using the Mirun HK Series fine-pitch video wall specifications. Label processor output ports and cabinet order on the as-built map so a technician can trace a display fault to the affected area.
Which image, signal and recovery tests should the buyer witness?
Run solid colors, grayscale, motion, small text and actual project content using the agreed presets and viewing positions. Check seams, brightness and color against the project criteria. Where backup inputs, redundant signal paths or restart behavior are in scope, have the integrator demonstrate the agreed recovery and record the observed outcome.
| Test | What to witness | Record for handover |
|---|---|---|
| Physical build and access | Installed alignment, ventilation, labeling and service access against the approved drawing. Confirm relevant site trade sign-offs. | Revision-marked as-built drawing, cabinet or zone labels, photos and inspection record. |
| Mapping and playback | Labeled test grid, all intended input sources and actual content at the approved source and output settings. | Canvas, cabinet order, output assignments, input format, test files and approved presets. |
| Image and camera | Agreed visual criteria or measurements for uniformity, brightness, seams and pixel defects. Where required, test latency or camera artifacts with the intended equipment. | Pattern, brightness mode, ambient condition, test point and observation or measurement. For filmed use, retain clips and camera settings. |
| Signal and recovery | Have the integrator use an agreed scenario for backup input, redundant data path or restart where specified. Check the observed recovery against the agreed criterion. | Tested scenario, observed result, restored state and remaining exceptions. Include measured interruption time where required. |
| Files and operator handover | Verify the approved backups, then have the operator demonstrate routine startup, source selection and escalation. | Versioned files in the buyer’s repository, operator sign-off, contacts and the exception register. |
Agree in advance which recovery checks may interrupt the display and when the integrator can run them. After the test, confirm the approved live settings are restored and record any follow-up. Have the qualified personnel handle site electrical verification under the project’s procedures.
What must be handed over before final acceptance?
Collect the final drawings, cabinet and port maps, controller and receiving-card files, calibration data, presets, manuals and service contacts. Have the operating team demonstrate the agreed daily tasks. Record each unresolved issue with its impact, owner, due date and retest, then obtain the buyer’s written decision on whether it blocks handover.
Ask the integrator to confirm the backups match the accepted live configuration and show how they would be recovered in an agreed test environment or maintenance window. Store the files with a revision, date and named owner in a buyer-controlled location. Include the spare parts and tool list, training attendance and approval records.
Use the LED display quotation guide for site testing and handover scope to assign who supplies the files, witnesses the tests and signs the exceptions. To discuss your installation, request a fine-pitch LED video wall quote with a commissioning plan and include the drawings, intended sources and site acceptance criteria.
LED display commissioning FAQ
Can we reuse the factory acceptance test record for site handover?
Carry forward the factory results and configuration baseline. Witness the checks that depend on the installed display, site sources, ambient conditions, support and service interfaces, and operating team.
What should we do if the wall shows the right picture with the wrong cabinet map?
Use the labeled native grid to reconcile the actual cabinet order and output ports. Correct the as-built map and affected settings, repeat the playback check, and save the corrected configuration and test result together.
Can we accept the wall while a backup source is waiting to be tested?
Record the untested backup source, its operational impact, the person responsible and the retest date. The authorized buyer decides whether that exception blocks use or handover under the agreed acceptance plan.
Which configuration files should the operator receive?
Request the processor project, receiving-card configuration, cabinet map, calibration data, source presets and applicable software versions. Keep the verified files, recovery instructions and access owner together in the buyer’s approved repository.
How do we sign off operator training?
Have the operators demonstrate routine startup and shutdown, source selection, the approved recovery steps and whom to contact for faults. Record the participants, tasks demonstrated and any further training agreed.